Finishing work by our team.
Drywall, ceilings, lighting details and paint, photographed on the job.
Before and after, from the same spot.
Drag the handle to compare. Each pair was shot from the same position before and after the work, so the only thing that changes is what we rebuilt.


In progressVaulted great room
A dark, low-feeling room opened up and finished: old panelling out, the frame exposed and re-sheathed, then a smooth vaulted ceiling and new floor carried through to the window wall.


Fireplace wall
A two-story fireplace wall taken from bare framing to large-format panels set flush, with even seams top to bottom and the ceiling line kept unbroken.


In progressBay-window room
Failed plaster stripped back around three window openings, the substrate made good, then walls, trim and light fittings finished clean against a restored floor.


Attic room
An unfinished attic corner closed in and finished — sheathing, taping and paint carried into the ceiling slope so the corner reads as one continuous surface.
01
02
03
04
05
06
07
08
09
10
11
12
13Real finishing work by our team, shown for craftsmanship. New Wasatch Front projects are added as they finish.
Get your free estimate.
One visit, a written line-item quote and a target finish date. You know the price before any work starts.

