Skip to content

Draper, UT · Licensed R101

Bathroom Remodeling in Draper

Many Draper homes sit along the east bench, where primary baths and kids' baths were finished to builder grade and no longer match how busy families actually use them. Wasatch Finish updates those rooms without moving walls or re-engineering anything: new tile surfaces, vanities and fixtures, fresh paint, and drywall repair where old finishes have worn. For an east bench homeowner who wants a calmer primary bath or a more functional shared bath, we scope the work in writing first, so you know exactly what changes, what it costs, and when it will be done before any demo begins.

What this includes

Includes tile surfaces, vanity and fixture replacement, paint, and drywall repair within existing walls, non-structural and under $50,000.

  • Tile surfaces, shower and tub surrounds
  • Vanities, mirrors, and fixtures
  • Drywall repair and moisture-aware finishing
  • Paint, trim, and door fit
  • Plumbing fixture trade coordination
More about bathroom remodeling

Typical pricing

From about $8,000

Driven by tile, fixtures, the vanity, and the size of the room.

An estimate, not a quote. Your real number follows an on-site visit and a written scope.

Get a straight quote

We show up

Scheduled consult, a protected job site, and a point of contact who answers.

We quote it straight

A written scope — what’s in, what’s not, what drives the price.

We finish the job

Punch list closed, site clean, the details handled.

Questions

Bathroom Remodeling in Draper, answered.

Can you update a Draper primary bath without moving any walls?

Yes. We refresh tile, vanities, fixtures, and finishes inside the existing layout. We do not relocate walls or alter structure, which keeps the project within our R101 scope and on a predictable schedule.

Do you replace just the shower, or the whole bathroom?

Either. Some Draper homeowners want only a tiled shower surround redone; others want vanity, fixtures, paint, and tile together. We scope to what you need and price each piece clearly.

How long does a single Draper bathroom remodel take?

A straightforward single-bath update typically runs a few weeks from start to final walkthrough. The target finish date is written into your quote, not left open-ended.

Let’s scope it straight.

One on-site visit, one clear written scope, one finish date. No vanishing act.

Get a straight quoteCall