Lehi, UT · Licensed R101
Basement Finishing in Lehi
Many of Lehi's newer homes near Traverse Mountain were sold with a wide-open basement waiting for a plan. We turn that empty space into rooms your family actually uses, a guest suite, a media room, a home office for the Silicon Slopes commute, or a play area that keeps the upstairs quiet. As a licensed Utah DOPL R101 studio, we handle the framing of partition walls, insulation, drywall, trim, paint, and finish details, then keep you informed at every stage so there are no surprises. You get a defined scope, a realistic timeline, and a finished basement done right the first time.
What this includes
Non-structural basement finishing only: partition framing, insulation, drywall, trim, flooring prep, and paint, with no foundation or load-bearing work.
- Framing within the existing footprint
- Insulation, drywall, taping, and texture
- Paint, trim, baseboard, and interior doors
- Electrical and plumbing trade coordination
- Flooring prep and finish details
Typical pricing
$25–$65 / sq ft
Driven by square footage, finish level, the condition of the space, and whether you add a bath.
An estimate, not a quote. Your real number follows an on-site visit and a written scope.
Get a straight quoteWe show up
Scheduled consult, a protected job site, and a point of contact who answers.
We quote it straight
A written scope — what’s in, what’s not, what drives the price.
We finish the job
Punch list closed, site clean, the details handled.
Questions
Basement Finishing in Lehi, answered.
Do you handle the permit for finishing a Lehi basement?
We help you understand what Lehi City requires and coordinate the finishing work to meet those expectations. Permit submission and inspection scheduling are handled in step with the project so everything stays documented and on track.
Can you add a bedroom and bathroom to my unfinished basement?
Yes, within non-structural scope. We frame the partition walls, run the rough finishes, and complete drywall, trim, and paint. Egress and mechanical requirements are reviewed up front so the space is planned correctly before work begins.
How long does a basement finish take?
Most basements move through framing, drywall, and finish stages over several weeks depending on size and layout. We give you a stage-by-stage timeline at the start and tell you promptly if anything shifts.
Basement Finishing in other cities
Let’s scope it straight.
One on-site visit, one clear written scope, one finish date. No vanishing act.